1 范围.............................................................................................................................................6
2规范性引用文件............................................................................................................................8
3术语和定义...................................................................................................................................9
4 设计过程....................................................................................................................................9
4.1 总体流程.......................................................................................................................9
4.2 支架概念设计...............................................................................................................10
4.3 测试...............................................................................................................................11
5 管道布置设计准则.....................................................................................................................11
5.1 架间距.............................................................................................................................11
5.1.1 最大间距(Lmax)和最小间距(Lmin )...............................................................11
5.1.2 竖直支架.............................................................................................................11
5.1.3 水平支架.............................................................................................................12
5.1.4 轴向支架.............................................................................................................16
5.1.5 利用LG, RV, RW支架实现轴向约束.................................................................17
5.1.6 管道自由端.........................................................................................................21
5.1.7 管道分支.............................................................................................................22
5.1.8 大小头.................................................................................................................22
5.1.9 组件.....................................................................................................................23
5.1.9.1间距.................................................................................................................23
5.1.9.2靠近组件的管道支架......................................................................................23
5.1.10 接管区域...........................................................................................................26
5.2 柔性分析.........................................................................................................................26
5.2.1 管道热膨胀位移的计算.....................................................................................29
5.2.2 必要管腿长度的确定.........................................................................................29
5.3 设备连接.........................................................................................................................30
5.4 3/6锚固点(TS/CB)....................................................................................................30
6 支架设计....................................................................................................................................31
6.1 支架设计.........................................................................................................................31
6.2 锚固板载荷.....................................................................................................................33
6.3 接管载荷(设备,法兰,阀门等).............................................................................33
7 管道布置设计导则对施工现场的指导作用.............................................................................35
7.1 电厂可执行性检查.........................................................................................................35
7.2 可运行性验收.................................................................................................................35
8 图表说明....................................................................................................................................36
9 附录...........................................................................................................................................37
附录.A 跨距计算...................................................................................................................37
附录.B 跨距、柔性、设备和支架载荷...............................................................................43
4
CEPR-EDM/专业代码-三位流水号-2010
图目录
图1 温度与热膨胀关系......................................................................................................40
图2 例题2中系数kz...........................................................................................................41
图3 例题3中系数ku...........................................................................................................42
。。。。。
对于详细设计和最终验算,应该按照设计程序文件[2]表1进行。本导则确保满足DP05.01规程的应力、热膨胀限值以及在各工况下的安全要求。
导则规定了管道走向和支吊架概念设计、验收以及在详细设计中哪些基本要求需要提供。设计和建造规程以及管道制造的内部规定都应该考虑。
如果不遵循本导则,则要提供其它验收报告,例如用简化分析或计算机的详细计算分析。
对于交通事故的威胁,必须提供相应措施保护系统。本导则不涉及排气、冲洗和气囊防护准则。这些准则在设计规程或类似文件中规定。
通常不采用需要维修的支架。
........。。。
4.3 测试
建造完成后,按照此导则的技术规则执行目测,目测规则在第7节介绍。
5 管道布置设计准则
5.1 架间距
支架间距是指两个支架之间管道轴线的有效长度,这两个支架在所考虑的方向上具有相同的约束。
5.1.1 最大间距(Lmax)和最小间距(Lmin )
最大间距(Lmax):水平直管上两个竖直支架之间的最大许用距离。由最大间距(Lmax)计算出约束管道水平、垂直和轴向的两个支架的轴向许用间距。支架间距为最大间距(Lmax)的管道,在重力作用下的最大挠度≤2.5mm,以保证管道不会出现负坡度。
Level.Material.1表(例如:A.F.1)中列出最大间距(Lmax)值。
主要由管道的柔性要求确定最小许用间距(Lmin)值。
确定最小许用间距(Lmin)不小于下列值: